Wallpaper, tile, beadboard, and a door: Major bathroom progress, ORC week 7
One Room Challenge Week 7! We have finally picked up the pace and are now getting so close to being done.
- Week 1: Design, plans, and before photos
- Week 2: Choosing electrical locations and sconce placement
- No post week 3
- Week 4: Tub, drywall, and design
- No posts weeks 5-6
- Week 7: Tile, beadboard, and door
- Week 8: The REVEAL! With sources and budget
Big Bathroom Progress
We've spent the past couple weekends working a ton on the bathroom and my parents helped me get the tile done (my mom and I tiled, my dad watched the kids) the other Friday, and Jason grouted Sunday. I spent a couple of evenings listening to Taylor Swift and hanging wallpaper instead of relaxing on the couch like I wanted... but it's done!
The wallpaper is this pretty one from A Street Prints (sponsored). It was my first time using pasted wallpaper (versus peel and stick). Easier in some ways (like on the corners).
We've been spraying the trim and laundry room beadboard walls the past few weekends too, and man, am I glad to be done using the paint sprayer. But we did spray these beadboard panels flat on the ground which was 1000x faster than the brush-and-roll method for beadboard. We'll touch them up once they're installed. I picked out art today too so wanted to visualize it and brought the beadboard in and leaned them up against the walls. I can almost picture it!
Then, right after I took these pictures this evening, I got excited to hang some doors and I installed the new antique brass hinges and doorknob. I think the antique brass (almost matches the original ones upstairs) will give the basement some character and less of a brand-new build feel.
Later this week I'll do the pleated shade DIY on the sconce shades, and this weekend, we'll install the beadboard and baseboards. The plumber will install the toilet and sink next week! Almost done!
No comments
Post a Comment